Abstract
In this paper, the study on path loss and delay of cellular communication is conducted by considering doppler shift fading effect, shadowing effect and handover session in urban area. The experiment will consist observation on three different wireless communication module. This three-wireless module will have different carrier frequency and radio interface technologies to determine the effect of doppler shift to communication path loss and handover delay of a moving vehicle. The path loss of a moving vehicle will be determined based on measured received power on communication modules antenna and transmit power from base station. Handover delay that experienced by a moving vehicle will be measured based on data transmission latency during communication session transferring from previous cell network area that pass by the vehicle to a new cell network area. From this experiment, the best selection of wireless communication module by considering doppler shift effect and handover delay in urban area is determined as suited module to be use on connected car system.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
More From: IOP Conference Series: Materials Science and Engineering
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.