Abstract

In south-eastern Nigeria, gully erosion has assumed an alarming proportion and this prompted the use of geospatial information technology to map a gully erosion site in Oron, Akwa Ibom State for effective remediation and control. Ground controls were provided in the vicinity of the gully head through the use of dual frequency Leica GPS 1200. The initiation and growth of gullies, releases large amounts of sediments into receiving streams thereby polluting sources of water supply to the rapidly increasing urban population.  The obtained data were downloaded and processed using Leica Geo Office 8.3 and the processed data exported to Arc GIS 10.1 and Auto CAD Civil 3D 2013 for terrain analysis-DEM, Also, the Leica Total Station TS 06 was employed to carry out topographic mapping. The delineated runoff contributing area aided in the computation of maximum discharge (using the Rational method). The computed runoff of 33.919m3/s accounts for the rapid rate gully headscarp retreat at the rate of 1.2 m/day during the month of July, prior to intervention by the state government. The results obtained were employed in designing gully control structures.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.