Abstract

This paper presents microgrid (MG) operation constrained to the reliability, flexibility, and environment indices in the presence of distributed generations (DGs) and energy storage systems (ESSs). The proposed scheme minimizes the total expected operating cost of MGs and DGs. It is also subject to alternating current (AC) power flow equations of MGs, constraints of operation, reliability, and flexibility in MG, and operation model of power sources and storage devices. Stochastic programming is incorporated to model uncertainties of load, energy price, the active power of renewable energy generation, availability of MG equipment, sources, and storage devices. Following on, a hybrid solver formed by combining artificial bee colony (ABC) and sine-cosine algorithm (SCA) is adopted to achieve the optimal solution with approximate conditions of unique ultimate response. Eventually, the suggested scheme is implemented on a 69-bus radial MG, where the numerical results confirm the capability of the scheme in improving the operation, reliability, flexibility, and environment status of the MG.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.