Abstract

To compute precise point positioning (PPP) and precise time transfer using GPS code and phase measurements, a new software named Atomium was developed by the Royal Observatory of Belgium. Atomium was also adapted to perform a phase‐only analysis with the goal to obtain a continuous clock solution which is independent of the GPS codes. In this paper, the analysis strategy used in Atomium is described and the clock solutions obtained through the phase‐only approach are compared to the results from the PPP mode. It is shown that the phase‐only solution improves the stability of the time link for averaging times smaller than 7 days and that the phase‐only solution is very sensitive to the station coordinates used. The method is, however, shown to perform better than the IGS clock solution in case of changes in the GPS receiver hardware delays which affects the code measurements.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.