Abstract

The goal achieved in the preparation of production planning is more than one. UD Rezeki Berkah is a small business medium-sized enterprise engaged in the production of building materials. UD Rezeki Berkah aims to meet market demand and must consider the costs used during production to maximize profit. Because of these problems, it will be solved with a goal programming model where this method can solve more than one goal to get a model with optimal goal priority. This research provides an optimal solution, namely achieving the target sales volume and production costs within the Rp limit target. 929,128,971, and profit targets reached Rp. 562,751,890 for a period of one year.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.