Abstract
Interoperable multi-vendor High-Voltage Direct-Current (HVDC) grids are a key enabler for the integration of renewable energy (in particular offshore wind) and its transmission over longer distances to consumers. However, most HVDC systems today are single-vendor and point-to-point. Various technical and non-technical aspects need to be considered, for example, (real-time) testing, legal aspects (intellectual property and regulation), and the multi-vendor interoperability process. This paper presents findings from the READY4DC project, which is a larger and open European effort involving diverse stakeholders, including HVDC manufacturers, transmission system operators, wind developers, academia, and research institutes. It summarizes key technical recommendations, emphasizing comprehensive interaction studies and the development of a structured legal framework to facilitate the development and operation of a multi-vendor, multi-terminal HVDC grid. The READY4DC project highlights the need for increased harmonization, transparent communication among stakeholders, and future-oriented research to ensure the robustness and interoperability of interconnected grids. Collaborative efforts are key for addressing technical complexities and advancing the deployment of multi-vendor multi-terminal HVDC technology.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.