Abstract

This paper investigates a scheduling combined manpower-vehicle routing problem with a central depot in and a set of multi-skilled manpower for serving to customers. Teams are in different range of competencies that it will affect the service time duration. Vehicles are in different moving speeds and costs and not all the vehicles are capable to move toward all the customers’ sites. The objective is to minimize the total cost of servicing, routing, and lateness penalties. This paper presents a mixed integer programming model and two meta-heuristic approaches of genetic algorithm (GA) and artificial bee colony algorithm (ABC) are developed to solve the generated problems. Furthermore, Taguchi experimental design method is applied to set the proper values of parameters. The available results show the higher performance of proposed GA compared with ABC, in quality of solutions.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call