Abstract

This paper presents a Monte-Carlo algorithm considering loads defined by fuzzy numbers. In this methodology states are sampled according to the probabilistic models governing the life cycle of system components while fuzzy concepts are used to model uncertainty related to future load behavior. This model can be used to evaluate generation/transmission power system reliability for long term planning studies as one uses the more adequate uncertainty models for each type of data. For each sampled state a fuzzy optimal power flow is run so that one builds its power nor supplied membership function. The paper proposes new indices reflecting the integration of probabilistic models and fuzzy concepts and discusses the application of variance reduction techniques if loads are defined by fuzzy numbers. A case-study based on the IEEE 30 bus system illustrates this methodology.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.