Abstract

This paper presents new sequential imperfect preventive maintenance (PM) models incorporating adjustment/improvement factors in hazard rate and effective age. The models are hybrid in the sense that they are combinations of the age reduction PM model and the hazard rate adjustment PM model. It is assumed that PM is imperfect: It not only reduces the effective age but also changes the hazard rate, while the hazard rate increases with the number of PMs. PM is performed in a sequence of intervals. The objective is to determine the optimal PM schedule to minimize the mean cost rate. Numerical examples for a Weibull distribution are given.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call