Abstract

The effect of ageing on the deterioration rate of most repairable systems cannot be ignored. Preventive maintenance (PM) is performed in the hope of restoring fully the performance of these systems. However, in most practical cases, PM activities will be only able to restore part of the performance. Bridging the gap between theory and practice in this area requires realistic modelling of the effect of PM activities on the failure characteristics of maintainable systems. Several sequential PM models have been developed for predetermined PM interval policies but much less effort has been devoted to age-based ones. The purpose of this paper is to develop an age-based model for imperfect PM. The proposed model incorporates adjustment factor in the effective age of the system. The system undergoes PM either at failure or after a predetermined time interval whichever of them occurs first. After a certain number of such PMs, the system is replaced. The problem is to determine both the optimal number of PMs and the optimal PM's schedule that minimize the total long-term expected cost rate. Model analysis relating to the existence and uniqueness of the optimal solutions is provided. Numerical examples are presented to study the sensitivity of the model to different cost function's factors and to illustrate the use of the algorithm.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.