Abstract

Resources for construction activities are limited in the real construction world. To avoid the waste and shortage of resources on a construction jobsite, scheduling must include resource allocation. A multicriteria computational optimal scheduling model, which integrates the time/cost trade-off model, resource-limited model, and resource leveling model, is proposed. A searching technique using genetic algorithms (GAs) is adopted in the model. Furthermore, the nondominated solutions are found by the multiple attribute decision-making method, technique for order preference by similarity to ideal solution. The model can effectively provide the optimal combination of construction durations, resource amounts, minimum direct project costs, and minimum project duration under the constraint of limited resources.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.