Abstract
We consider single and multiple part type production lines and networks with finite buffers and unreliable machines. Three fuzzy control modules, namely, line, assembly, and disassembly controller, are developed. The objective is to keep the work-in-process (WIP) inventory and cycle time at low levels, along with high machine utilization and throughput. This is achieved by adjusting the processing rate of each production stage so that workflow is balanced and the extreme events of machine starving or blocking are reduced. The approach is extensively tested via simulation. After a series of simulation runs, it has been observed that the proposed approach outranks other control policies in keeping the WIP inventory low.
Paper version not known (Free)
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have