Abstract

Life-cycle cost analysis (LCCA) is an important tool in transportation asset management. Transportation agencies have used both deterministic and probabilistic LCCA approaches. Probabilistic approaches allow decision makers to evaluate the risk of an investment by using uncertain input variables, assumptions, or estimates. The incorporation of fuzzy logic–based models into the risk analysis process is explored to enhance further the traditional probabilistic LCCA method. It proposes a fuzzy logic approach for determining the timing of pavement maintenance, rehabilitation, and reconstruction (MR&R) treatments in a probabilistic LCCA model for selecting pavement MR&R strategies. Instead of using predefined service life for initial construction and future rehabilitations, the proposed approach uses performance curves and fuzzy logic triggering models to determine the most effective timing of MR&R activities. The new approach is compared with the deterministic and traditional probabilistic approaches in a simple case study. The case study demonstrates that the fuzzy logic–based risk analysis model for LCCA can effectively produce results that are at least comparable to those of the benchmark methods while effectively considering some of the uncertainty inherent to the process.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.