Abstract

Compared to major structural repair or even replacement, preventative preservation of in-service pavements has been more popular in engineering practices, but recently, pavement preventative maintenance (PPM) has become more complex in China as the competition for pavement preservation funds has grown and the need to justify decisions has increased. Therefore, the life cycle cost analysis (LCCA) has increasingly attracted attention from transportation agencies. However, most of previous studies were conducted deterministically or only focused on a single factor, while PPM is apparently affected by many potential sources of uncertainty. The risk-based analysis to investigate potential risks and combined effects of multiple factors is a necessary component of PPM. This paper aims at presenting a risk-based PPM with the probabilistic LCCA for a Chinese highway case. Major analysis variables of different range are examined to probe risks of different scenarios, investigate combined effects of multiple variables and identify an optimal preservation strategy.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.