Abstract
To give a quantitative description of well control risk, a multi-layer fuzzy comprehensive evaluation based on AHP (analytic hierarchy process) is used. During the evaluation, risk factors and weight are given by Delphi method and AHP method. A multi-level and multi-factor evaluation system is built including four level-one factors of geologic uncertainty, well control equipments, techniques and crew quality, and fourteen level-two factors. Then a calculation is given with an oilfield in West China. The result shows geologic uncertainty is the primary factor leading to well control risks and the grade of well control risk is “higher risk”. The application result indicates that well control risk assessment by fuzzy comprehensive evaluation is feasible. Key words : Risk assessment; Fuzzy comprehensive evaluation; Analytic hierarchy process; Weight; Risk factor
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.