Abstract
With the US re-entering the ITER project, the US safety program has been tasked to address safety issues left unresolved during the US absence over the past five years. As a consequence our current and future US ITER safety studies will focus on validating US safety analysis tools that underpin the ITER safety analysis, refining in-vessel dust and tritium inventory safety limits and developing corresponding dust and tritium removal strategies that will demonstrate compliance with ITER limits without hampering operational flexibility of the machine.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.