Abstract

To address the damage characteristics and deficiencies of the existing continuously reinforced concrete pavement (CRCP), which are the high construction cost and irregular crack distribution patterns, a concrete pavement structure called partially continuous reinforced concrete pavement (PCRCP) is proposed. In this paper, the early-age (28 days, without traffic) behaviour of PCRCP subjected to environmental loading is investigated. To this end, full-scale field tests were carried out in Xiangjiagou Tunnel, Shanxi Province, China. Testing results showed that the PCRCP test section with the partial continuous reinforcement length of 100 cm and active crack spacing of 5 m can provide better early-age performance and lower initial construction cost in this study. The PCRCP test section with the active crack control method has a uniform crack distribution pattern with narrow width compared to the CRCP test section. The results of this study would provide data support and reference for the rational design of PCRCP.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.