Abstract
ABSTRACTIn South Korea, the performance of continuously reinforced concrete pavement (CRCP) has been better than that of jointed concrete pavement (JCP). However, most of the Portland cement concrete (PCC) pavements in South Korea have been JCP, primarily due to the difficulty in providing extra space along the edge of the pavement needed for concrete delivery in CRCP construction. In a tube-feeding method (TFM), concrete can be supplied from the front of a paver, which could facilitate CRCP construction without extra space needed. In the present study, efforts were made to improve the capability of TFM in placing longitudinal steel at correct elevations, which resulted in the development of tube feeding equipment (TFE). Field testing results showed that the key to ensuring steel placement at correct elevations was to keep longitudinal steel in adequate tension. The distance from the back of the tubes and the front of the mould, up to 1500 mm, did not have substantial effects on the steel settlement. To evaluate the viability of CRCP construction with TFE, a 400 m long CRCP section with 300 mm slab thickness and 8.2-m width was constructed and performance monitored.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.