Abstract
The confluence overflow facility with transverse weir is adopted in China to reduce the occurrence of overflow. Under normal conditions, most of the facilities do not overflow. The study on the hydraulic structure without overflow is helpful to improve the pollutant interception efficiency. In addition, the weir height equation for different intercepting pipe diameters was required. Full scale experiments and simulation studies were carried out, and the reliability of the simulation results was verified by experiments. The simulation describes the hydraulic structure and shows that the backflow area appears on the side of the chamber away from the interceptor and at the inlet of the pipe. The results show that when the ratio of weir height to pipe diameter is less than 1.2, the closure pipe is non pressure closure, when the ratio is from 1.2 to 1.75, it becomes half pressure, and when the ratio is greater than 1.75, it is converted to pressure. The increased rate of intercepting flow with the rise of weir height would change under the effect of different flow characteristics. Based on the experimental data distribution and the hydraulic characteristic, the weir height equation was deduced for the pipe diameter of 0.4 m. Other pipe diameter simulations showed that this equation was also applicable.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.