Abstract
A company engaged in shrimp feed production, has 4 physical distribution networks, namely: PT. JWL, PT. SWS, PT. BWP, and, CV. WS. Logistics problems at the company is not achieving the fulfillment of customer orders with the right amount and the right time. This is due to the company’s inefficient inventory, distribution and transportation systems. The method used to solve inventory problems is to set safety stock. To solve distribution problems use Distribution Requirement Planning, Reorder points and determine the order frequency. Through a series of processing and problem solving steps, it is known that the total needs that must be met by the company is 10.502.308 kg with a safety stock of 132,860 tons.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.