Abstract

The multiple failures of a ballasted track 877 m long built to guide the wheels of a heavy gantry crane used in a logging yard in northern Alberta, Canada, are described. At the time of construction the crane was claimed to be the heaviest, and its wheels were supported by a ballasted track with wood lateral members (ties). The track was built in 1985 but exhibited excessive differential vertical and lateral deformations in subsequent years. The focus is on failure of a track related to freeze-thaw conditions and the solution to track instability problems, which was achieved geotextiles.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.