Abstract
AbstractThis paper presents a systematic and generic framework reference for the practice of stakeholder management in the construction industry. It contains findings from empirical studies, comprising six interviews, a pilot study, a questionnaire survey in Hong Kong, and 15 interviews in Australia. Six activity groups (i.e., precondition, project data identification, stakeholder estimation, decision making, action and evaluation, and sustainable support) and a total of 18 activities within these groups and their interrelations formulate the main body of the framework. The proposed framework was validated by five real-life projects, the results of which confirm the applicability of the proposed framework. This study serves as a reference for project-management teams to systematically manage stakeholders in construction projects.
Accepted Version (
Free)
Published Version
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have