Abstract

Foundation precompression through use of preload fills combined with vertical sand drains to accelerate consolidation is described with reference to uses, design procedures, and possible effects of alternative methods for installing vertical sand drains. Vertical sand drains to accelerate consolidation are probably not required where soils contain continuous intermediate sand layers within the compressible stratum, but pressure-relief wells may be required to reduce excess pore-water pressures in the sand layers. The pressure-relief wells can be sand drains, free-flowing wellpoints, or conventional wells. Also, vertical sand drains will probably serve no purpose where design loadings will not exceed preconsolidation stresses. Field tests may be required in some stratified materials to evaluate the efficacy of thin pervious soils as drainage layers. The importance of designing for secondary compression effects is emphasized.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.