Abstract

Guangzhou Metro Line 6 the 8th tender Tianhe Station tunnel shielding meet hole body fissure water is abundant, tunnel soil mass disintegrates easily when water permeate, consolidating with end-advancing horizontal grouting technique. By reasonable choice construction equipment, drilling location, double liquid grouting parameters to control the construction process, enhance process monitoring, get a good reinforcement effect; analyzed the prospects of the construction method.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.