Abstract

The main motivation of this study is to provide, for the first time, a formulation and solution for a class of production scheduling problems (as in cluster tools) characterized mainly by resource collaboration to perform an operation and while allowing batches and considering alternative production methods. We develop a formulation for the new problem and term it a multiple mode per operation, resource collaboration, and constrained scheduling problem (MRCCSP). Some of the important new characteristics we consider are: multiple products (families); multiple orders (jobs) per family; precedence restrictions among the operations that constitute a job; alternative modes for the performance of an operation (each of which needs a set of collaborating resources) may be defined; complementary and exclusive restrictions between operation-modes; batch production is allowed; and setup times may depend on sequence and batch-size. The objective of the MRCCSP is to minimize makespan. We formulate the MRCCSP as a mixed integer linear programming model, and acknowledging the considerable size of the monolithic formulation required, we prescribe a specific method to achieve size reduction. Finally, a customized branch and bound algorithm for optimally solving this problem is proposed and examined experimentally.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.