Abstract

Discusses the redundant machinery construction enterprises. The method of calculation of a network of warehouses taking into account the possibility of different conditions of the reserve from the part to the backup machine. The technique allows you to determine the required number of warehouses of different levels, taking into account the time of delivery of the spare element from the warehouse on the other hand, it is necessary to take into account that the increase in inventory helps to slow down the turnover of reserve elements, increases the cost of the Insurance Fund.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.