Abstract

The work is devoted to the development of a method for minimizing the lost profit arising as a result of the phased financing of the projects of the aviation enterprise development program. It has been established that the minimization of lost profits, if any, can be ensured by the timely launch of individual projects. To solve the problem, its mathematical description was compiled and a solution method was proposed that allows minimizing lost profits due to the timely launch of projects, taking into account penalties for delaying their implementation. The paper gives an example of the formation of an optimal program for the development of an aviation enterprise.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call