Abstract

Reliability and quality of monolithic construction works are determined by analyzing the system of preparation for implementation of certain technological operations, establishing and ensuring the order, sequence and timetable of works, and supply of all types of resources. Periodic inspections of compliance with construction norms and regulations are held in the course of construction and installation works. As a follow-up on such inspections, prescriptive orders on rectification of detected nonconformities and violations within a specified time limit are issued. There is no provision for the time consumed by corrective action in the calendar plan, and consequently the actual duration of construction as often as not exceeds the scheduled term to a great extent. In this connection, there is a task of assessing the level of impact of violations on the efficiency of functioning and the organizational quality of production processes. Analytic research into this problem allows for a conclusion on the need for development of a mathematical model to be used in the assessment of duration of construction taking into account the random pattern of occurrence of violations.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call