Abstract

In the case of single part production planning at PT Showa Katou Indonesia The problem is the production plan is only a production schedule, the schedule is made only two times (morning and evening) in a day. The schedule is created after the Production Planning Inventory Control (PPIC) contacts the customer to ascertain what the customer needs. After knowing what the customer needs, a production schedule and planning are made. The impact of this erratic production schedule causes loss of production time because if there is no demand then nothing is done by workers and the machine stops production because they have to wait for an erratic production schedule. Another impact is the absence of stock in the warehouse and delays in delivery because they are only waiting for the production schedule from PPIC and waiting for finished goods to be produced. To reduce the bad impact, it is necessary to forecast production planning with data mining methods to help these problems. The method used is the ARIMA method with the model (p,d,q) (1,1,1). The results of testing using tools and manual testing showed significant values with MAD = 52.45, MSE = 3917.84, MAPE = 0.05.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.