Abstract

In this paper, we study the permutation flow shop scheduling problems with deteriorating jobs on no-idle dominant machines. The objective is to minimize one of the two regular performance criteria, namely, makespan and total completion time. For each objective, the following dominant machines constraint: idm, ddm, idm– ddm and ddm– idm are considered. We present a polynomial time solution algorithm for each of the four cases.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call