CO2-Plume Geothermal (CPG) power plants can use geologically stored CO2 to generate electricity. In this study, a Flexible CO2 Plume Geothermal (CPG-F) facility is introduced, which can use geologically stored CO2 to provide dispatchable power, energy storage, or both dispatchable power and energy storage simultaneously—providing baseload power with dispatchable storage for demand response. It is found that a CPG-F facility can deliver more power than a CPG power plant, but with less daily energy production. For example, the CPG-F facility produces 7.2 MWe for 8 h (8 h-16 h duty cycle), which is 190% greater than power supplied from a CPG power plant, but the daily energy decreased by 61% from 60 MWe-h to 23 MWe-h. A CPG-F facility, designed for varying durations of energy storage, has a 70% higher capital cost than a CPG power plant, but costs 4% to 27% more than most CPG-F facilities, designed for a specific duration, while producing 90% to 310% more power than a CPG power plant. A CPG-F facility, designed to switch from providing 100% dispatchable power to 100% energy storage, only costs 3% more than a CPG-F facility, designed only for energy storage.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.