Abstract
AbstractDue to the increasing share of renewable energies in the power sector, the need for energy storage and flexible performance is rising. This study provides an in‐depth investigation of the flexibility of a Power‐to‐Gas plant for the production of synthetic natural gas. Model‐based analysis is conducted for the individual technologies PEM electrolysis, MEA absorption and fixed‐bed methanation as well as for the continuously operated process. This study reveals that the Power‐to‐Gas plant offers a capacity flexibility of 87–125 %, corresponding to 4.79–6.88 MW electrical input power.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.