Abstract

Economic uncertainty analysis of employing a membrane reactor (MR) equipped with H2O separation membranes for a synthetic natural gas (SNG) production as simultaneous power-to-gas and CO2 utilization technologies was carried out. Based on previously reported reaction kinetics, process simulation models were created for a conventional packed-bed reactor (PBR) and an MR. Deterministic economic analysis showed the unit SNG production cost of 1.67 $ kgSNG−1 in an MR compared to 1.82 $ kgSNG−1 in a PBR for a SNG production capacity of 1000 kg d−1, showing about 8% cost reductions in the MR. From sensitivity analysis, raw material and labor were identified as the key economic factors to affect a unit SNG production cost for all cases studied. Stochastic economic analysis using a Monte-Carlo simulation method provided better insights for economic-uncertainty associated with premature technology like a SNG production in an MR using H2O separation membranes by presenting a wide range of SNG production costs and their probability.

Full Text
Published version (Free)

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call