Abstract

AbstractThis manuscript suggests quasi‐oppositional fast convergence evolutionary programming (QOFCEP) technique to determine short‐term generation scheduling of fixed head hydrothermal system comprising pumped storage hydro plants (PSHPs), solar PV plants (SPVPs) and wind turbine generators (WTGs) with demand response program (DRP). PSHPs are used with fixed head hydro power plants (FHPPs), thermal generating units (TGUs), SPVPs and WTGs to operate system conveniently. Uncertainties related to renewable generations and load demands have been considered. Self‐adaptive tent mapped scenarios of uncertain parameters are generated within higher level of confidence space to deal with the system uncertainties. DRP is applied to level the load demand curve and to enhance system flexibility and reduce operational cost. Numerical results of typical test system are matched with those attained by fast convergence evolutionary programming (FCEP) and evolutionary programming (EP).

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.