Abstract

The Russian R&D Program for superconducting power devices is underway, supported both by government and electric power companies. In this program R&D on HTS power cables is considered as most advanced and close to commercialization. In the framework of the program, several, heavily instrumented, 5m cables have been tested following by the 30m – 3 phase experimental power cable development and testing in 2008–2009. The latest achievement is development and testing of the first long length 3×200m power cable with rating 1.5/2kA–20kV. In parallel with just the cable development the innovative cryogenic system has been developed as well for the cable cooling. The system is using neon as working substance and radial turbo-machines in refrigerator. Cooling power is up to ∼8kW at 65K, inter-maintenance time ∼30,000h. The cryogenic pump with superconducting motor can be used to provide subcooled liquid nitrogen flow ∼0.1–1.5kg/s at 0.1–2.5MPa pressure. After extensive tests at special test facility, HTS power cable and cryogenic system are planning to be installed at some substation in Moscow utility grid. In this review some details about Russian HTS power application program, 200m cable and cryogenic system designs and tests results are presented.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.