Abstract

This article addresses the economic lot sizing and scheduling problem in flexible flow lines with unrelated parallel machines over a finite planning horizon. It is assumed that all parameters such as demand rates for the products are deterministic and constant over a finite planning horizon. A new mixed zero-one nonlinear mathematical program for the problem has been developed. Due to the difficulty of obtaining the optimal solution, an efficient constructive heuristic algorithm is also proposed and evaluated. Computational experiments indicate that the proposed heuristic is very hopeful especially for obtaining a near-optimal (or optimal) solution in medium and large-scaled problems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.