Abstract

The problem considered in this paper is a flexible flow line with multiple serial stages, where there are one or more unrelated parallel machines at each stage and there exists a bottleneck stage in the system. The objective of the scheduling problem is to minimize the total flow time of jobs. A heuristic method is proposed to solve the scheduling problem. It focuses on the bottleneck stage and a heuristic procedure is developed as part of the method to construct the schedule for the bottleneck stage. This is because the bottleneck stage may not be the first; the arrival time of jobs at the bottleneck stage may not be zero. A trial simulation is adopted to schedule the jobs at the stages ahead of the bottleneck stage so as to obtain the arrival time of jobs at the bottleneck stage. To evaluate the performance of the suggested method, the shortest processing time (SPT) dispatching rule is investigated for comparison purposes and computational experiments are performed on randomly generated test problems. Results show that the suggested method performs better than the SPT dispatching rule for various test problems.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.