Abstract

Just-in-time JIT (Just In Time) is an important procedure in scheduling problems which aims at minimizing minimising both earliness and tardiness at the same time. In this case, the problem is a multi-objective scheduling problem. A candidate solution method for this type of problem is finding the Pareto-optima. The present research investigates the single single machine scheduling problem in which the three objects: number of tardy job, maximum earliness, and maximum tardiness must be minimized minimised

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.