Abstract
The field testing of a metal connecting system for use with round timber poles to fabricate roof trusses is described in this article. The system was used to produce trusses for the roof frame on structures in the north and south of Sierra Leone. Working within a village-based project in a developing region requires that the engineer not only be able to transfer technological skills but also be cognizant of local socio-economic, cultural, and material availability factors.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.