Abstract

This paper proposes a procedure for avoiding delay faults in field with slack assessment during standby time. The proposed procedure performs path delay testing and checks if the slack is larger than a threshold value using selectable delay embedded in basic elements (BE). If the slack is smaller than the threshold, a pair of BEs to be replaced, which maximizes the path slack, is identified. Experimental results with two application circuits mapped on a coarse-grained architecture show that for aging-induced delay degradation a small threshold slack, which is less than 1ps in a test case, is enough to ensure the delay fault prediction.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.