Abstract
This paper details the implementation of an innovative timber bridge technology developed for secondary road applications. A pilot bridge was constructed and field tested under loads comparable to required design loads. A through-girder primary system with transverse floor beams and longitudinal wood deck secondary system are involved. A unique steel hanger system for suspending the transverse floor beams and providing I-beam action under lateral load was configured. Results of the field load test program and analytical predictions from a computer model are described. The pilot bridge proved to be economically competitive and structurally effective.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.