Abstract

Research and development was conducted on a prototype timber bridge technology developed for rural bridge sites. The work included conception, computer modeling, laboratory load tests of a reduced size specimen, field construction of a pilot bridge and field load testing. This paper describes the laboratory load test phase. Three loadings comprised of four concentrated loads simulating a truck wheel pattern were conducted. Results of preliminary analytical simulation work is also described. The laboratory specimen demonstrated the structural effectiveness of the concept and led to the final design and implementation of the pilot field bridge.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.