Abstract

Bucket foundation has been used for offshore wind turbine in Qidong city, China. In order to transport and install bucket foundations together with the upper offshore wind turbines, a non-self-propelled integrated transportation and installation vessel is designed. Wet tow of the dedicated vessel with two bucket foundations and the upper offshore wind turbines, one of the key issues of the integrated transportation and installation techniques, has been studied through a series of field experiments with different air pressures inside the bucket foundations and different ballasts in the vessel. The motion behaviors of the dedicated vessel are investigated. The results show that the dedicated vessel is quite stable during wet tows. In addition, with the air pressures inside the bucket foundations increase, the vessel becomes more stable. However, larger draft makes the vessel less stable and the ballast in the vessel may have little effect on the stability.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.