Abstract
The role of economic load dispatch is increasing in the future power system, making best use of the ramp rate capability of thermal generating units to follow rapid and large disturbances due to the large amount of renewable energy penetration. This paper proposes a dynamic economic load dispatch method using the generator's feasible operation region approach. It is a region within which generating units may change their outputs in order to match a demand profile while satisfying ramp-rate and supply-demand balance constraint. The method can specify the amount of reserve required to maintain a feasible operation for restrictive demand profile which cannot be served due to generating unit's capability. The proposed method has been successfully tested on a 3 generator system supplying a typical afternoon demand profile.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.