Abstract

Feasibility studies of an advanced 900-MW(electric) pressurized water reactor (PWR) aiming at the total elimination of soluble boron during normal reactor operation (extended uranium cycle length of 16 GWd/t) are summarized.The neutronic consequences of this boron elimination on assembly design (poisoning, moderation ratio, cluster system, etc.) are presented. The specific assembly geometry has been optimized by taking into account a number of parameters, in particular the moderating ratio and thermal-hydraulic performances.The modifications that must be made to a standard PWR are studied (loading pattern and control rod management) to control the core with the same safety criteria as for the standard PWR, during the whole cycle, from power operation to cold shutdown. A new control rod system, with two different kinds of control rod clusters, has been developed. The first allows power control during operation while the second ensures cold shutdown. It is shown that these modifications do not require different technologies from those of present PWRs.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.