Abstract

The main objective of our ongoing research is data collection for integrity management (IM) tasks, in other words for pipeline integrity management system (PIMS), helping the transporting pipeline operators in different decision situations. Either the reserves of the girth welds after a long-term operation can be identified or the girth welds with different defects should be repaired and/or replaced. From the operators’ point of view, the long-term operation is the cost-effective way; however, from the safety point of view, the managing of the lifecycle of the pipeline is the more reliable way. Unfortunately, inadequate girth welds cause catastrophic damages in transporting pipelines, all over the world. Consequently, the optimal operation of the pipelines is a complex task. The paper introduces our investigation program executed on full-scale pipeline sections. Fatigue (100,000 cycles) and burst tests were executed on different pipeline sections containing girth welds. Long-term operated and replaced gas transporting pipeline sections, furthermore, both appropriate and inadequate girth welds were investigated. The testing results and the damage histories were compared with each other; safety factor (SF) was defined and calculated for the assessment of the reliability of the girth welds.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.