Abstract
The high market attractiveness index and competitive position made Dewi Media Lestari invest in building a new factory. The factory specifically is used to produce convection products and apparel. Development is carried out using a systematic layout planning and computerized relative allocation of facilities technique. The objective of this research is to obtain an ideal layout that can minimize the distance between departments. As a result, there are nine departments with a total area of 385 m2 consisting of 18 m2loading dock department, 36 m2 raw material department, 86 m2cutting department, 42 m2 branding department, 21 m2 screen printing department, 105 m2 sewing department, 28 m2 finishing department, 28 m2 packing department, and 21 m2 warehouse department. Material handling costs for the initial layout produced using the systematic layout planning method are IDR 29,808.95 per day. After adjusting with Computerized Relative Facility Allocation Technique, the most ideal final layout was produced with minimal material handling costs of IDR 24,411.40 per day.
Talk to us
Join us for a 30 min session where you can share your feedback and ask us any queries you have
Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.