Abstract

After a contract with Hyundai Heavy Industries Co. Ltd. (HHI) on January 2010 for the manufacture of the ITER equatorial and lower ports, manufacturing preparation activities have been performed. As part of the preparation activities, a full scale mock-up of the lower port stub extension (LPSE) #16 was fabricated by HHI in order to verify fabrication feasibility and set up the fabrication sequence for the LPSE. In this paper, major technical results from fabrication of a full scale mock-up will be presented with emphasis on the main manufacturing procedure, welding, nondestructive examination (NDE) and 3D dimensional inspection. Afterwards, progress of real product manufacturing is introduced.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.