Abstract

The ITER Vacuum Vessel (VV) features upper, equatorial and lower ports. Although the port design has been overall completed in the past, the design of some remaining interfaces was still in progress and has been finalized now. As the ITER construction phase has started, the procurement of the VV ports has been launched. The VV upper ports will be procured by the Russian Federation DA, while the equatorial and lower ports will be procured by the Korean DA. The main industrial suppliers were selected and development of the manufacturing design is in progress now. Since the VV is classified at nuclear level N2, design and manufacture of its components are to be compliant with the French code RCC-MR and regulations of nuclear pressure equipment in France. These regulations make a strong impact to the port design and manufacturing process, which is in progress now.

Full Text
Paper version not known

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.