Abstract

The aim of this paper is to inform about the fabrication and erection of the bridge load-bearing steel structure, SO205-00. The bridge is located on the 2,097th km over the Majersky creek (Majerský potok). The load-bearing structure of the bridge deck is composed of a composite steel-concrete grate structure acting as a continuous beam over spans of 33 m + 3 x 40 m + 33 m. The steel part of the load-bearing structure is made of welded built-up beams with a constant height of web 1440mm and, according to the static design requirements, various thickness and width of flanges. The connection of the steel-concrete bridge deck with the steel structure is ensured by means of shear connectors welded to the upper flange. In the paper are listed new standards (STN EN) and rules (TKP20, MVDRR) valid at production and erection time of the objective bridge load-bearing structure.

Talk to us

Join us for a 30 min session where you can share your feedback and ask us any queries you have

Schedule a call

Disclaimer: All third-party content on this website/platform is and will remain the property of their respective owners and is provided on "as is" basis without any warranties, express or implied. Use of third-party content does not indicate any affiliation, sponsorship with or endorsement by them. Any references to third-party content is to identify the corresponding services and shall be considered fair use under The CopyrightLaw.